Requirements – Same teams members as before.
- A report of the CIS baseline built into a GPO
- Note: there is a report feature for a GPO to where the setting that have been applied can be exported into a report file; that is the report I’m referring to here.
- Applied to the same DC Windows 7 pair we have been working from assignment 2.
- A video from the team as how this improves our security with faces and voices.
- Expand upon the GPO that was created in assignment 2 from 20 settings to what the team feels sufficient to secure Windows 7.
- This assignment builds to what is presented to the Pen-Testing class for Assignment 4, so the 4th grade is how well the team does in it’s selections from the baseline in assignment 3.
- Due Date: Friday March 24th 11:59pm
- Late assignments have a 10% penalty per week.