• Log In
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Sys & Infrast Lifecycle Mngt 1 - 001

MIS5203

Sys & Infrast Lifecycle Mngt 1

MIS 5203.003 ■ Spring 2020 ■ David Lanter
  • Home
  • Instructor
  • Syllabus
  • Schedule
    • First Part of Semester
      • Unit 1 Introduction
      • Unit 2 IS Development Lifecycle (SDLC)
      • Unit 3 Project Initiation and Selection
      • Unit 4 Project Planning and Management
      • Unit 5 Requirements Analysis – Processes
      • Unit 6 Requirements Analysis – Data
    • Second Part of Semester
      • Unit 8 – Case Study 2 and Design – Database
      • Unit 9: Design – User Experience
      • Unit 10: Development
      • Unit 11: Implementation and Testing
  • Deliverables
    • Assignments
      • Answers to Questions
      • Case Studies
    • Participation
    • Team Project
  • Gradebook

Unit 03: Project Initiation and Selection

Wrap Up

January 29, 2019 by David Lanter

Lecture slides and video

Feasibility Study – Alans Best Chocolates

Business Case – Smith Consulting

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

All Questions

January 22, 2019 by David Lanter

  1. Practice using the CalculateProjectNPV_B.xlsx spreadsheet to calculate costs and benefits for the Customer Tracking System (Pine Valley Furniture) as you read Chapter 5 in Modern Systems Analysis and Design (MSAD).  Apply the spreadsheet to illustrate cost/benefit analysis, including: Cash flow analysis, use of Net Present Value (NPV) in calculating Return on Investment (ROI), and break-even analysis
  2. Apply the CalculateProjectNPV_B.xlsx spreadsheet to Case Study 1: Teradata Data Mart Consolidation Return on Investment at GST to illustrate cost/benefit analysis, including: Cash flow analysis, use of NVP in calculating ROI for the Data Mart Pilot Project, and break-even analysis
  3. How does the project structure illustrated in the Microsoft Project Software Development Plan template (accessible in  zip file) compare with the project plan presented in Exhibit 10 of the Teradata Data Mart Consolidation ROI case study?

Post your answers to  all 3 questions in a single PDF file to Unit #3 Case  Study 1 in Canvas that you name: Unit-3_Assignment_My-Name.pdf where MyName is your name.  E.g. “Unit-3_Assignment_David-Lanter.pdf”.  Be sure to put your name in the top section of your document, include each question number and question and explain your answers in the body of your assignment document.

No comments are required for Unit #3 this week.

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 1

January 22, 2019 by David Lanter

Use the CalculateProjectNPV_B.xlsx spreadsheet to calculate costs and benefits for the Customer Tracking System (Pine Valley Furniture) as you read Chapter 5 in Modern Systems Analysis and Design (MSAD).  Apply the spreadsheet to illustrate cost/benefit analysis, including: Cash flow analysis, use of Net Present Value (NPV) in calculating Return on Investment (ROI), and break-even analysis.

Include a copy of your spreadsheet (and answers to all questions this week) with your answers to this question in a PDF file that you name: Unit-3_Assignment_MyName.pdf where MyName is your name.  E.g. “Unit-3_Assignment_DavidLanter.pdf”

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 2

January 22, 2019 by David Lanter

Apply the CalculateProjectNPV_B.xlsx spreadsheet to Case Study 1: Teradata Data Mart Consolidation Return on Investment at GST to illustrate cost/benefit analysis, including: Cash flow analysis, use of NVP in calculating ROI for the Data Mart Pilot Project, and break-even analysis

Include a copy of your spreadsheet (and answers to all questions this week) with your answers to this question in a PDF file that you name: Unit-3_Assignment_MyName.pdf where MyName is your name.  E.g. “Unit-3_Assignment_DavidLanter.pdf”

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 3

January 22, 2019 by David Lanter

How does the project structure illustrated in the Microsoft Project Software Development Plan template (accessible in  zip file) compare with the project plan presented in Exhibit 10 of the Teradata Data Mart Consolidation ROI case study?

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Primary Sidebar

Weekly Discussions

  • Unit 01: Introduction (1)
  • Unit 02: IS Development Lifecycle (SDLC) (5)
  • Unit 03: Project Initiation and Selection (5)
  • Unit 04: Project Planning and Management (5)
  • Unit 05: Requirements Analysis – Processes (2)
  • Unit 06 – Requirements Analysis – Data (2)
  • Unit 08: Database Design (6)
  • Unit 09: Design – User Experience (5)
  • Unit 10: System Development (4)
  • Unit 11: Implementation Testing (4)
  • Unit 12: Post Implementation and Maintenance (5)
  • Unit 13: Maintenance and Course Review (5)
  • Welcome (1)

Copyright © 2025 · Course News Pro on Genesis Framework · WordPress · Log in