• Log In
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Sys & Infrast Lifecycle Mngt 1 - 001

MIS5203

Sys & Infrast Lifecycle Mngt 1

MIS 5203.003 ■ Spring 2020 ■ David Lanter
  • Home
  • Instructor
  • Syllabus
  • Schedule
    • First Part of Semester
      • Unit 1 Introduction
      • Unit 2 IS Development Lifecycle (SDLC)
      • Unit 3 Project Initiation and Selection
      • Unit 4 Project Planning and Management
      • Unit 5 Requirements Analysis – Processes
      • Unit 6 Requirements Analysis – Data
    • Second Part of Semester
      • Unit 8 – Case Study 2 and Design – Database
      • Unit 9: Design – User Experience
      • Unit 10: Development
      • Unit 11: Implementation and Testing
  • Deliverables
    • Assignments
      • Answers to Questions
      • Case Studies
    • Participation
    • Team Project
  • Gradebook

Systems and Infrastructure Lifecycle Management

January 12, 2019 by David Lanter

This course will introduce you to the methods used as organizations builds an enterprise information system architecture within an environment of internal control. Topics include information system planning, management and usage, the development, acquisition and maintenance of these technologies and their impact on the organization’s business processes.

Course Objectives

  1. Evaluate the business case for the proposed investments in information systems acquisition, development, maintenance and subsequent retirement to determine whether it meets business objectives.
  2. Evaluate IT supplier selection and contract management processes service levels and requisite controls are met.
  3. Evaluate the project management framework and controls to determine whether business requirements are achieved in a cost-effective manner while managing risks to the organization.
  4. Conduct reviews to determine whether a project is progressing in accordance with project plans, is adequately supported by documentation, and has timely and accurate status reporting.
  5. Evaluate controls for information systems during the requirements, acquisition, development and testing standards, procedures and applicable external requirements.
  6. Evaluate the readiness of information systems for implementation and migration into production to determine whether project deliverables, controls and the requirements are met.
  7. Conduct post-implementation reviews of systems to determine whether project deliverables, controls and the requirements are met.

Filed Under: Welcome Tagged With:

Primary Sidebar

Weekly Discussions

  • Unit 01: Introduction (1)
  • Unit 02: IS Development Lifecycle (SDLC) (5)
  • Unit 03: Project Initiation and Selection (5)
  • Unit 04: Project Planning and Management (5)
  • Unit 05: Requirements Analysis – Processes (2)
  • Unit 06 – Requirements Analysis – Data (2)
  • Unit 08: Database Design (6)
  • Unit 09: Design – User Experience (5)
  • Unit 10: System Development (4)
  • Unit 11: Implementation Testing (4)
  • Unit 12: Post Implementation and Maintenance (5)
  • Unit 13: Maintenance and Course Review (5)
  • Welcome (1)

Copyright © 2025 · Course News Pro on Genesis Framework · WordPress · Log in