• Log In
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Sys & Infrast Lifecycle Mngt - BNAI 2020

MIS5203

Sys & Infrast Lifecycle Mngt 1

MIS 5203.951 ■ Spring 2020 ■ William Bailey
  • Home
  • Instructor
  • Syllabus
  • Schedule
    • First Part of Semester
      • Unit 1 Introduction
      • Unit 2 IS Development Lifecycle (SDLC)
      • Unit 3 Project Initiation and Selection
      • Unit 4 Project Planning and Management
      • Unit 5 Requirements Analysis – Processes
      • Unit 6 Requirements Analysis – Data
    • Second Part of Semester
      • Unit 8 – Case Study 2 and Design – Database
      • Unit 9: Design – User Experience
      • Unit 10: Development
      • Unit 11: Implementation and Testing
  • Deliverables
    • Assignments
      • Answers to Questions
      • Case Studies
    • Team Project
  • Gradebook

William Bailey

Write about one thing of interest you took way from: MSAD Chapter 13 “System Implementation”

January 30, 2020 by William Bailey Leave a Comment

Filed Under: Unit 11: Implementation Testing Tagged With:

Write about one thing of interest you took away from one or more of the following CISA readings:

January 30, 2020 by William Bailey Leave a Comment

• CISA Chapter 3.5 “Business Application Development”, pp. 177-181
• CISA Chapter 3.6
• CISA Chapter 3.9

Filed Under: Unit 11: Implementation Testing Tagged With:

Write about one thing of interest you took away from the following reading:

January 30, 2020 by William Bailey Leave a Comment

• ISACA “Auditing Risks in Virtual IT Systems”
• ISACA “IT Audits of Cloud and SaaS”

Filed Under: Unit 11: Implementation Testing Tagged With:

Case Study 2 – All Questions

January 27, 2020 by William Bailey

Post your answers to the following Case Study questions as comments posted to individual questions (1 through 3) posted below.  You are additionally required to post your 3 comments to your classmates’ answers to gain participation credit for this Unit#8.

  1. What are the positive benefits (“pros”) and risks (“cons”) of a buy versus build decision on the ES Package?
  2. What implementation challenges might Sebastian Joseph face in relation to training and change management?
  3. What the pros and cons of outsourcing IT infrastructure and software module development versus owning and developing them in-house?

Filed Under: Unit 08: Database Design Tagged With:

Case Study 2 – Question 1

January 27, 2020 by William Bailey Leave a Comment

What are the positive benefits (“pros”) and risks (“cons”) of a buy versus build decision on the ES Package?

Filed Under: Unit 08: Database Design Tagged With:

All Questions

January 22, 2020 by William Bailey

  1. Practice using the CalculateProjectNPV_B.xlsx spreadsheet to calculate costs and benefits for the Customer Tracking System (Pine Valley Furniture) as you read Chapter 5 in Modern Systems Analysis and Design (MSAD).  Apply the spreadsheet to illustrate cost/benefit analysis, including: Cash flow analysis, use of Net Present Value (NPV) in calculating Return on Investment (ROI), and break-even analysis
  2. Apply the CalculateProjectNPV_B.xlsx spreadsheet to Case Study 1: Teradata Data Mart Consolidation Return on Investment at GST to illustrate cost/benefit analysis, including: Cash flow analysis, use of NVP in calculating ROI for the Data Mart Pilot Project, and break-even analysis
  3. How does the project structure illustrated in the Microsoft Project Software Development Plan template (accessible in  zip file) compare with the project plan presented in Exhibit 10 of the Teradata Data Mart Consolidation ROI case study?

Post your answers to  all 3 questions in a single PDF file to Unit #3 Case  Study 1 in Canvas that you name: Unit-3_Assignment_My-Name.pdf where MyName is your name.  E.g. “Unit-3_Assignment_David-Lanter.pdf”.  Be sure to put your name in the top section of your document, include each question number and question and explain your answers in the body of your assignment document.

No comments are required for Unit #3 this week.

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 1

January 22, 2020 by William Bailey

Use the CalculateProjectNPV_B.xlsx spreadsheet to calculate costs and benefits for the Customer Tracking System (Pine Valley Furniture) as you read Chapter 5 in Modern Systems Analysis and Design (MSAD).  Apply the spreadsheet to illustrate cost/benefit analysis, including: Cash flow analysis, use of Net Present Value (NPV) in calculating Return on Investment (ROI), and break-even analysis.

Include a copy of your spreadsheet (and answers to all questions this week) with your answers to this question in a PDF file that you name: Unit-3_Assignment_MyName.pdf where MyName is your name.  E.g. “Unit-3_Assignment_DavidLanter.pdf”

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 2

January 22, 2020 by William Bailey

Apply the CalculateProjectNPV_B.xlsx spreadsheet to Case Study 1: Teradata Data Mart Consolidation Return on Investment at GST to illustrate cost/benefit analysis, including: Cash flow analysis, use of NVP in calculating ROI for the Data Mart Pilot Project, and break-even analysis

Include a copy of your spreadsheet (and answers to all questions this week) with your answers to this question in a PDF file that you name: Unit-3_Assignment_MyName.pdf where MyName is your name.  E.g. “Unit-3_Assignment_DavidLanter.pdf”

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Question 3

January 22, 2020 by William Bailey

How does the project structure illustrated in the Microsoft Project Software Development Plan template (accessible in  zip file) compare with the project plan presented in Exhibit 10 of the Teradata Data Mart Consolidation ROI case study?

Filed Under: Unit 03: Project Initiation and Selection Tagged With:

Write about one thing of interest you took away from the following reading:

January 21, 2020 by William Bailey Leave a Comment

NIST “Security Considerations in the SDLC”, pp.21-31

Filed Under: Unit 10: System Development Tagged With:

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Go to Next Page »

Primary Sidebar

Weekly Discussions

  • Unit 02: IS Development Lifecycle (SDLC) (4)
  • Unit 03: Project Initiation and Selection (4)
  • Unit 04: Project Planning and Management (4)
  • Unit 05: Requirements Analysis – Processes (1)
  • Unit 06 – Requirements Analysis – Data (1)
  • Unit 08: Database Design (5)
  • Unit 09: Design – User Experience (4)
  • Unit 10: System Development (3)
  • Unit 11: Implementation Testing (3)
  • Unit 12: Post Implementation and Maintenance (4)
  • Unit 13: Maintenance and Course Review (4)
  • Welcome (1)

Copyright © 2025 · Course News Pro on Genesis Framework · WordPress · Log in