MIS 3535: Week of 11.15.2014 – 11.21.2014

This week was productive for both the PMs and BAs. On Wednesday, we had the revised Communication Mgmt. and Change Mgmt. plans due, which Melissa and Evan worked on, respectively. We also had our weekly meeting on Friday, which was attended by everyone. The BAs’ prototype looks fantastic, despite a couple functional issues that shouldn’t be an issue to fix. I gave them some advice on the prototype’s functional design, and we arranged a time to watch the BAs give their presentation. This way we can ensure that the presentation will meet all criteria for a good grade. As for the fall break, we, the PMs, plan to finish all deliverables so that the binder will be ready to hand in by the time we get back. I will personally be working on the MS Project document and the RACI chart. I am confident that we will at least be almost finished with it by the time the fall break is over. Also, as usual, I created the weekly Progress Report for the group as well.

Skip to toolbar